Yiwu shuangfeng Waste Incineration power Co., Ltd. Project

Construction time:2005年 locations:yiwu zhengjiang province
Construction scale of the project is two 65t/h+two 40t/h circulating fluidized bed garbage incinerators and two 12000kw steam bleeding and condensing steam turbine generator units, which is private station project of the enterprise, with daily garbage disposal capacity of 1200t. It was completed in November 2005.

Related news:
Last one:
Next article:
黄瓜视频污污污-在线看污污视频-污网站在线看-污污免费网站